Popular
AutismAndUs
Launch date: October 2018
Combined FreeTimePays following: 101K


Community sponsors:

Construction & regeneration
01 Nov 2018 - Daniel Sturley
Gallery

The Construction of Two Chamberlain Square

Two Chamberlain Square is continuing to rise at Paradise Birmingham, it's now looming over Centenary Way producing a wide canyon feel on the way down to the Museum and Art Gallery.

Photo by Daniel Sturley

Related

The Construction of Two Chamberlain Square





Two Chamberlain Square is continuing to rise at Paradise Birmingham, it's now looming over Centenary Way producing a wide canyon feel on the way down to the Museum and Art Gallery.

Photo by Daniel Sturley


Photos by Daniel Sturley

Share  Connect with us
100 passion points
Art, culture & creativity
30 Oct 2018 - Noushka Galley
News & Updates

New Endeavours

https://www.youtube.com/embed/GxO_oKlzU-U

Some new work has let my portfolio branch into video editing!

#MyChesterStory

 

Related

Share  Connect with us
30 passion points
Construction & regeneration
29 Oct 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

Bank Tower Two now has it's main structure up to the 29th floor and much more cladding is installed or being prepared. The tower looks amazing in the winter sunlight! More photos in the full post.

Photo by Daniel Sturley

Related

The Construction of Bank Tower Two





Bank Tower Two now has it's main structure up to the 29th floor and much more cladding is installed or being prepared. The tower looks amazing in the winter sunlight! More photos in the full post.

Photo by Daniel Sturley


Photos by Daniel Sturley

Share  Connect with us
80 passion points
Construction & regeneration
21 Oct 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

The scene from the Library of Birmingham shows how Bank Tower Two is rising well above the others in the westside cluster with several floors still to go. Over 20 photos in this update.

Photo by Daniel Sturley

Related

The Construction of Bank Tower Two





The scene from the Library of Birmingham shows how Bank Tower Two is rising well above the others in the westside cluster with several floors still to go. Over 20 photos in this update.

Photo by Daniel Sturley


Photos by Daniel Sturley

Share  Connect with us
90 passion points
Construction & regeneration
21 Oct 2018 - Daniel Sturley
Gallery

The Construction of One Chamberlain Square

Much of the external work is complete at One Chamberlain Square, just the rest of the sills to install it seems as well as finishing off the retail spaces at ground level. 12 more photos in the full post.

Photo by Daniel Sturley

Related

The Construction of One Chamberlain Square





Much of the external work is complete at One Chamberlain Square, just the rest of the sills to install it seems as well as finishing off the retail spaces at ground level. 12 more photos in the full post.

Photo by Daniel Sturley


Photos by Daniel Sturley

Share  Connect with us
100 passion points

Top Contributors

Daniel Sturley
AutismAndUs points: 6287
Combined FreeTimePays points: 43K
Noushka Galley
AutismAndUs points: 500
Combined FreeTimePays points: 520

Show more