Popular
AutismAndUs – A FreeTimePays community
Launch date: October 2018
Combined FreeTimePays following: 101K


Community sponsors:

Construction & regeneration
04 Nov 2018 - Daniel Sturley
News & Updates

Birmingham Construction Update - November 2018

Exchange Square now has it's main structure up to level with Maclaren House, a new crane has been installed on the site of 103 Colmore Row, the steel work on Three Centenary Square is rising around the central core, Bank Tower Two is up to the 30th floor and One Chamberlain Square is getting its final external details finished. Lots more photos and links to galleries in the full post.

Related View community

Birmingham Construction Update - November 2018





Exchange Square now has it's main structure up to level with Maclaren House, a new crane has been installed on the site of 103 Colmore Row, the steel work on Three Centenary Square is rising around the central core, Bank Tower Two is up to the 30th floor and One Chamberlain Square is getting its final external details finished. Lots more photos and links to galleries in the full post.


Eastside Construction Feature

 

Arena Central Feature

 

Bank Towers One and Two Feature

 

One Chamberlain Square Feature

 

Arena Central Feature

 

Crane Photography Feature 

 

Arena Central Feature

 

Two Chamberlain Square Feature

Photos by Daniel Sturley

Share  Connect with us
90 passion points
Construction & regeneration
01 Nov 2018 - Daniel Sturley
Gallery

The Construction of Two Chamberlain Square

Two Chamberlain Square is continuing to rise at Paradise Birmingham, it's now looming over Centenary Way producing a wide canyon feel on the way down to the Museum and Art Gallery.

Photo by Daniel Sturley

Related View community

The Construction of Two Chamberlain Square





Two Chamberlain Square is continuing to rise at Paradise Birmingham, it's now looming over Centenary Way producing a wide canyon feel on the way down to the Museum and Art Gallery.

Photo by Daniel Sturley


Photos by Daniel Sturley

Share  Connect with us
100 passion points
Art, culture & creativity
30 Oct 2018 - Noushka Galley
News & Updates

New Endeavours

https://www.youtube.com/embed/GxO_oKlzU-U

Some new work has let my portfolio branch into video editing!

#MyChesterStory

 

Related View community

Share  Connect with us
30 passion points
Construction & regeneration
29 Oct 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

Bank Tower Two now has it's main structure up to the 29th floor and much more cladding is installed or being prepared. The tower looks amazing in the winter sunlight! More photos in the full post.

Photo by Daniel Sturley

Related View community

The Construction of Bank Tower Two





Bank Tower Two now has it's main structure up to the 29th floor and much more cladding is installed or being prepared. The tower looks amazing in the winter sunlight! More photos in the full post.

Photo by Daniel Sturley


Photos by Daniel Sturley

Share  Connect with us
80 passion points
Construction & regeneration
21 Oct 2018 - Daniel Sturley
Gallery

The Construction of Bank Tower Two

The scene from the Library of Birmingham shows how Bank Tower Two is rising well above the others in the westside cluster with several floors still to go. Over 20 photos in this update.

Photo by Daniel Sturley

Related View community

The Construction of Bank Tower Two





The scene from the Library of Birmingham shows how Bank Tower Two is rising well above the others in the westside cluster with several floors still to go. Over 20 photos in this update.

Photo by Daniel Sturley


Photos by Daniel Sturley

Share  Connect with us
90 passion points

Top Contributors

Daniel Sturley
AutismAndUs points: 6407
Combined FreeTimePays points: 54K
Noushka Galley
AutismAndUs points: 500
Combined FreeTimePays points: 520

Show more